Where concrete mixer or pump cannot reach while concrete is poured on construction sites, the concrete bucket is used connected to the tower crane and the concrete is delivered to the desired area.
Concrete bucket hose (200 mm in diameter and 2m tall as standard), if desired, concrete bucket hose (200 mm in diameter and 2m tall as standard), and personnel carrying platform (balcony that provides direction to the hose in the use of concrete bucket). ) optionally, it can be added to the concrete bucket.